# ExaMetra PRD Status Report **Date:** August 1, 2026 **PRD Reference:** SchoolOS Consolidated PRD (12 Modules: A-L) **Current Status:** 25-30% implementation complete --- ## Executive Summary The project has **partial implementations** across multiple modules but lacks cohesive architecture. Today's consolidation work unified Calendar and Grading, but **10 of 12 modules require completion** to achieve PRD compliance. **Current Coverage:** - Module A (Academics): ~40% (competency grids, grading logic, basic assessments) - Module C (Communication): ~30% (basic messaging, no escalation policy engine) - Module D (Learning Hub): ~20% (videos/exercises exist, not fully integrated) - Module F (Exam Mode): ~35% (exam-proctoring view exists, not kiosk-compliant) - Module K (Identity): ~50% (auth exists, but not full GDPR integration) - **Modules B, E, G, H, I, J, L:** ~0% (missing or stub implementations) --- ## Module-by-Module Status ### Module A: Academics Core **Status:** Partially Complete (40%) **Implemented:** - Competency templates and grids - Learning progress entry logging - Assessment creation and results - Grading scheme configuration - Grade computation logic - Report generation framework **Missing:** - Mastery level definitions (DB schema incomplete) - Competence Flower radar chart (partially done) - Report PDF generation (framework exists, not production-ready) - Clone-on-customize for templates - Phrase-template system for narrative text - Full audit trail for grade changes **Database Tables:** 18 of 22 required tables exist **Action Needed:** Complete mastery levels, implement report PDF, audit logging --- ### Module B: Signage & Emergency Alerts **Status:** Stub Only (5%) **Exists:** - Basic signage admin view in `/admin/signage` - Minimal DB schema **Missing:** - TV/kiosk display client - Emergency alert system - Priority-based rotation logic - Real-time alert override - Integration with notifications (Module H) - Counseling notice privacy (§11.3) - Fire/lockdown/medical/general emergency types **Database Tables:** 2 of 4 required tables **Action Needed:** Build complete signage system from scratch --- ### Module C: Communication & Escalation **Status:** Partially Complete (30%) **Implemented:** - Direct messaging - Class announcements - Social room stubs - Basic message threading - DisciplinaryRecord model **Missing:** - **Escalation policy engine** (this is the heart of Module C) - No `EscalationPolicy` table - No business-day calculator - No "eligible to escalate at" computation - No escalation workflow UI - Parent→Admin escalation gate - Student→Counseling escalation - Class-hours messaging lock - Auto-unlock at period end (requires Module I integration) - Moderation workflow for social rooms **Database Tables:** 5 of 8 required tables **Action Needed:** Implement full escalation policy engine, add missing DB tables --- ### Module D: Learning Hub **Status:** Partially Complete (20%) **Implemented:** - Video upload and playback (stub) - Exercise/worksheet storage - Basic vocabulary trainer - Learning game framework **Missing:** - Curriculum alignment tracking - Content tagging system - Search/discovery interface - Student progress tracking - AI content authoring (partial, in Module E) - Assignment linking to competencies - Bulk content import **Database Tables:** 4 of 8 required tables **Action Needed:** Complete content tagging, search, progress tracking --- ### Module E: AI Tutor **Status:** Partially Complete (20%) **Implemented:** - AI chat widget (basic) - AI test generation - Grading audit trail **Missing:** - Homework-help context (knows class, student, competencies) - Hint-only policy enforcement - Lockout during exams (requires Module F integration) - Content translation for ELL students - Structured hint progression - RAG (retrieval-augmented generation) for Learning Hub content - Token usage tracking/limits **Action Needed:** Build context-aware homework help, integrate with Module F --- ### Module F: Exam Mode **Status:** Partially Complete (35%) **Implemented:** - Exam proctoring admin view - Session monitor component - Basic warning system - Live teacher controls **Missing:** - **Full-screen browser lockdown** (critical feature) - Kiosk mode enforcement (no URL bar, no task switcher) - Timer display - Copy-paste detection and blocking - Tab-switch detection and warning - Screenshot/screenshare blocking - Answer auto-submission on time limit - Incident logging per exam - Student warning escalation - Integration with Module F's `Assessment.deliveryMode = DIGITAL_LOCKED` **Database Tables:** 3 of 5 required tables **Action Needed:** Implement browser lockdown using Web API, complete kiosk flow --- ### Module G: Digital Notebook **Status:** Stub Only (10%) **Exists:** - Drawing canvas component - Basic drawing view - Drawing storage (no persistence) **Missing:** - **Per-subject notebook per student** (core data model) - Stylus/pen support with pressure sensitivity - Teacher pen annotation on tests/homework - Student search within notebook - Export to PDF - Syncing across devices - Offline-first architecture - Web Worker for stroke processing (needs Comlink integration) - Notebook versioning and history **Database Tables:** 1 of 4 required tables **Action Needed:** Rebuild from scratch with proper data model, stylus support --- ### Module H: Notifications **Status:** Missing (0%) **Exists:** - Announcements model (repurposed as partial notification) - Basic read/unread tracking **Missing:** - **Unified notification hub** (single place all alerts render) - Push notifications (Web Push API) - In-app notification center - Notification templates (data-driven) - Delivery channels (in-app, push, email) - Read/unread state management - Notification grouping and threading - Urgent override for safety alerts - Integration points with all other modules **Database Tables:** 3 of 5 required tables **Action Needed:** Build complete notification system from scratch --- ### Module I: Calendar **Status:** Recently Consolidated (70% → Target 100%) **Implemented (Today):** - Unified calendar component (`professional-calendar.tsx`) - Calendar manager utilities (`calendar-manager.ts`) - Multi-view support (month, week, agenda, day) - Drag-and-drop rescheduling - Event type system **Missing:** - School holiday/weekend calendar - Recurring event engine (basic pattern exists) - Business-day calculator (needed by Module C) - Period/class-hour mapping - Calendar synchronization with other modules - Holiday/term seed data - Integration with exam scheduling **Action Needed:** Add school calendar configuration, complete recurring logic --- ### Module J: Dashboard Widgets **Status:** Partially Complete (40%) **Implemented:** - Dashboard customization stubs - Widget library framework - Drag-and-drop widget arrangement (partial) **Missing:** - **Unified widget system** pulling from other modules - Read-only widgets (no data mutation from dashboard) - Widget state persistence - Mobile-responsive grid layout - Widget refresh/cache strategy - Performance optimization (lazy loading) - Custom widget builder for admins - Widget context (class, student, time-period) **Database Tables:** 2 of 4 required tables **Action Needed:** Complete widget architecture, integrate with Modules A-I --- ### Module K: Identity & Admin **Status:** Partially Complete (50%) **Implemented:** - User model and authentication - Role-based access control (basic) - School/ClassGroup/Student entities - Audit logging (basic) - Admin dashboard stubs **Missing:** - Role permission matrix (fine-grained access control) - School Year entity and lifecycle - Multi-school support - Teacher role variants (HOMEROOM_TEACHER, SUBJECT_TEACHER) - Parent-student relationship tracking - Staff co-determination features (Personalrat/union access) - Audit log completeness (many actions not logged) - Session management hardening - TOTP 2FA implementation - Rate limiting on login **Database Tables:** 8 of 10 required tables **Action Needed:** Complete role/permission matrix, implement 2FA, enhance audit --- ### Module L: Legal & Data Protection **Status:** Missing (0% - Critical!) **Exists:** - Compliance wizard (stub) - DPIA gating (minimal) - Compliance overview admin view **Missing:** - **GDPR/DSGVO compliance engine** (gate feature availability) - Data retention policies - Data export on request - Right to erasure with cascading deletes - RoPA (Records of Processing Activities) generation - Consent management per feature/module - Data controller vs processor tracking - Student privacy shield (data not exposed to unauthorized parties) - Parent rights management - DPO (Datenschutzbeauftragter) audit interface - Breach notification workflow - Data classification (sensitive, PII, etc.) - Access logging per sensitive data access - Integration with all modules (gates their availability) **Database Tables:** 5 of 8 required tables **Action Needed:** Build full GDPR compliance engine (non-negotiable before go-live) --- ## Architecture Issues ### 1. Missing API Standardization - 264 API routes with inconsistent response formats - No centralized error handling - No request validation middleware - No audit logging middleware **Fix:** Create `src/lib/api-response.ts` + middleware stack ### 2. Duplicate Fetching Logic - 160+ duplicate fetch patterns using useEffect - No caching/deduplication **Fix:** Universal `useApi()` hook (already planned, needs completion) ### 3. No Module Isolation - Components reach across module boundaries - Shared state management not centralized - Tight coupling between modules **Fix:** Enforce module APIs, move to facade pattern ### 4. Database Schema Gaps - Missing 15+ tables required by PRD - No enforcement of soft deletes - No audit trail on sensitive changes - No data classification column **Fix:** Complete Prisma schema, add migrations --- ## Critical Path to PRD Compliance ### Phase 1: Foundation (Weeks 1-2) — Must Complete - [x] Consolidate Calendar (done today) - [x] Consolidate Grading (done today) - [ ] Standardize API responses - [ ] Build useApi hook - [ ] Complete Module A (Academics) - [ ] Complete Module K (Identity) **Blocking:** Everything else depends on solid foundation ### Phase 2: Core Modules (Weeks 3-5) — Must Complete - [ ] Module C (Escalation engine — requires Module I calendar) - [ ] Module F (Exam Mode lockdown) - [ ] Module H (Notifications hub) - [ ] Module L (GDPR compliance engine) **Blocking:** Legal go-live ### Phase 3: Extended Modules (Weeks 6-8) — Nice-to-Have - [ ] Module B (Signage) - [ ] Module D (Learning Hub) - [ ] Module E (AI Tutor) - [ ] Module G (Digital Notebook) - [ ] Module J (Dashboard Widgets) --- ## Missing Database Tables (Urgent) ```sql -- Module A (Academics) MasteryLevelDefinition ClassCompetencyAssignment (clone-on-customize) -- Module C (Communication) EscalationPolicy EscalationRequest SocialRoom ClassMessagingLock -- Module H (Notifications) Notification NotificationTemplate NotificationDeliveryLog -- Module I (Calendar) SchoolCalendar (holidays, terms) ClassPeriod (class hours) RecurrencePattern -- Module J (Widgets) DashboardWidget UserWidgetPreference -- Module L (Legal) DataRetentionPolicy ConsentRecord DataExportRequest AccessLog ``` --- ## Code Metrics | Metric | Current | Target | Gap | |--------|---------|--------|-----| | Components | 72 | 45 | Consolidate 27 | | API Routes | 264 | 80 | Reduce 184 | | LOC (total) | ~200K | ~140K | Remove 60K | | Test Coverage | <50% | 70% | Add 2000+ tests | | Module Completeness | 30% | 100% | Build 70% | --- ## Immediate Next Steps (This Week) 1. **Review and Test** today's consolidation (calendar + grading) 2. **Create API standardization** layer 3. **Complete Module A** (Academics) — add missing DB tables, complete report PDF 4. **Start Module L** (Legal/GDPR) — non-negotiable for German school deployment 5. **Add 12 missing DB tables** and migrations --- ## Risk Assessment | Risk | Severity | Mitigation | |------|----------|-----------| | PRD too large | HIGH | Use phase approach, prioritize Modules A, C, F, K, L first | | GDPR non-compliance (Module L) | CRITICAL | Start Module L week 1, not week 8 | | Browser lockdown impossible | MEDIUM | Use Electron or Kiosk.js if Web API insufficient | | SQLite outgrown | LOW | Keep ORM abstract, upgrade path to Postgres ready | | Missing data model | HIGH | Complete all 50 DB tables before coding UI | --- ## Conclusion ExaMetra is **30% complete** against the 12-module PRD. Today's consolidation work (Calendar + Grading) was critical infrastructure. To reach **100% PRD compliance in 8 weeks**, the team must: 1. Complete Module A (Academics Core) — foundation for all others 2. Build Module L (GDPR compliance) in parallel — non-negotiable 3. Implement Modules C, F, H in weeks 3-5 4. Defer Modules B, D, E, G, J to weeks 6-8 if resources tight **Critical blocker:** Module L must be complete before go-live at any German school.